Follow the construction below
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
History
Return to First Page
Port side view.
Starboard side view.
Horizontal & vertical stabilizers bolted on.
Closing in the tail section.
Port side done, except for the elevator.
Starboard side done as well.
Upper wing mount blocks installed.
Center wing section bolted in place.
Sheeting in the nacelles.
Both elevators sheeted & finished.
Thankfully, the wings fit together.
12 feet. My hanger is too small !!
Bottom of port wing sheeted.
Port wing sheeting complete including aileron.
Wing sheeting completed.
Leading edge nose caps done. So, the wings are finished.
Final fitting of the wings.
Wing locking mechanisims in place.
Bottom of center wing section sheeted.
Working on the landing gear.
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
History
Return to First Page
Webpage design & Maintenance by Alan A Sandercott Terrace B.C. Canada
Contact me at: alan@sandercott.ca