 
 
 
Follow the construction below
 Page 1
   Page 2
   Page 3
   Page 4
   Page 5
   Page 6
   Page 7
   Page 8
   Page 9
 History
        
Return to First Page

Progress prior to Christmas 2016.

Alan(left) & Dave(right)

Dave has the Ziroli Cowlings fitted.

Dummy engines direct from Ziroli and ready for finishing.

Preparing the upper side of the wing for fibreglass cloth.

Top of the wing fibreglassed and ready for sanding. I'm glad Dave is doing it :-)

Dummy engines assembled.
 Page 1
   Page 2
   Page 3
   Page 4
   Page 5
   Page 6
   Page 7
   Page 8
   Page 9
 
 History
        
Return to First Page