Follow the construction below
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
History
Return to First Page
Final adjustments made to the tail section.
Servo compartments from top.
Servo locations from bottom.
New vert stab in place. Improves the profile.
Base of vert stab blocked in tight.
Added hardwood thrust blocks to top and bottom of rudder.
Added hardwood thrust blocks to top and bottom of rudder.
Added a couple holes for rudder control rods.
Shaping the lower tail piece.
Vert stabilizer now sheeted.
Rudder done c/w trim tab.
Creating the horn at the top of the vert stab.
There, now the top of the vert stab is finished
Leading strip of the vert stab finished.
Gone as far as I can for the moment. She's headed for the storage hanger.
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
History
Return to First Page