Follow the construction below


Page 1    Page 2    Page 3    Page 4    Page 5    Page 6    Page 7    Page 8    Page 9

History          Return to First Page


Port side view.
Port side view.


Starboard side view.
Starboard side view.


Horizontal & vertical stabilizers bolted on.
Horizontal & vertical stabilizers bolted on.


Closing in the tail section.
Closing in the tail section.


Port side done, except for the elevator.
Port side done, except for the elevator.


Starboard side done as well.
Starboard side done as well.


Upper wing mount blocks installed.
Upper wing mount blocks installed.


Center wing section bolted in place.
Center wing section bolted in place.


Sheeting in the nacelles.
Sheeting in the nacelles.


Both elevators sheeted & finished.
Both elevators sheeted & finished.


Thankfully, the wings fit together.
Thankfully, the wings fit together.


12 feet. My hanger is too small !!
12 feet. My hanger is too small !!


Bottom of port wing sheeted.
Bottom of port wing sheeted.


Port wing sheeting complete including aileron.
Port wing sheeting complete including aileron.


Wing sheeting completed.
Wing sheeting completed.


Leading edge nose caps done. So, the wings are finished.
Leading edge nose caps done. So, the wings are finished.


Final fitting of the wings.
Final fitting of the wings.


Wing locking mechanisims in place.
Wing locking mechanisims in place.


Bottom of center wing section sheeted.
Bottom of center wing section sheeted.


Working on the landing gear.
Working on the landing gear.


Page 1    Page 2    Page 3    Page 4    Page 5    Page 6    Page 7    Page 8    Page 9

History          Return to First Page