light line


"HMS AGAMEMNON BUILD" - Page Five

light line

Page 1     Page 2     Page 3     Page 4     Page 5     Page 6     Page 7     Page 8     Page 9     Page 10     Return to HMS Agamemnon

light line



I hope I got everything right on the upper gundeck as the main deck is now glued in.


Hard to work with a football game in the background :-)


Main deck being planked with Tanganijka wood.


Boat beams installed.


Working on the aft portion of the main deck.


Worked on the forward portion of the main deck today.


My fly tying vise comes in handy.


Just the armament to go now for the main deck.


Adding eye bolts to the decks and construction of stairs.


Getting ready to install the poop deck.


Glueing parts together is difficult with a cat rubbing up against my hand !!


Rear quarter deck cannons installed along with their port covers. Now I can bolt down the poop deck.


Friday 13th!! Snow this morning!! A good reason to stay in my den and work on my ship :-)


The poop deck is in and mostly finished.


Installing the two cannon under the front of the poop deck.
They need to be in place before the staircases are installed.


Young buck mule deer cleaning up under bird feeder.


Rigging the last of the cannons on the main deck.


Whipping rope ends. Brings back memories of my navy days long, long ago.


Last of the main deck cannons in place c/w breeching ropes & block and tackles.


Installing the gun port doors c/w control ropes.



Page 1     Page 2     Page 3     Page 4     Page 5     Page 6     Page 7     Page 8     Page 9     Page 10     Return to HMS Agamemnon




Website Design & Maintenance by: Alan A Sandercott - Terrace B.C. Canada
Copyright 2008-2023 Alan A Sandercott
Email: alan@sandercott.ca